Service process banner

Hunovate Electric Control Solution Design Service Process

Service process 01
Requirements Deep Dive

Application Scenario Confirmation
✓ Commercial HVAC: VRF multi-split systems/solar air conditioners/refrigeration
compressors/others
✓ Heat pump systems: Dual-purpose water machines/pool heat pumps/ultra-low temperature heat pumps/others
✓ Industrial equipment: BLDC motors/fan frequency converters/pump systems/others

Performance Indicators Quantification
✓ Functional requirements: FOC control mode (sensorless/sensored), communication protocols (Modbus/CAN), protection functions (over-voltage, under-voltage/over-current/overload/over-temperature/phase loss), others
✓ Electrical parameters: Input voltage (single-phase 220V±15% or three-phase 380V±10%), rated current (10A-200A), efficiency (PFC>96% and THD<5%), others

Certification Standards Clarification
✓ Basic certifications: CE/ROHS/REACH/others
✓ Advanced certifications: UL 60730 (North America safety)/ERP energy efficiency (heat pump COP>5.0)/FCC Part 15B (EMC)/others

Development Agreement & Mass Production Preparation

Development Cost Mechanism
✓ Cost composition: Covers R&D labor, prototype materials and testing certification expenses
✓ Rebate policy: Tiered rebate after mass production targets are met (e.g., 30% rebate at 50k units, full rebate at 100k units, specific ratios negotiable)
✓ Special note: Development fees are dedicated to securing project resources

Confidentiality Agreement
✓ NDA signing for ODM projects
✓ Encrypted technical document transfer

Supply Chain Assurance
✓ Component traceability system (original manufacturer batch reports from Infineon/ST etc.)
✓ Key component ABD solution (triple backup with imported brands like Infineon/ST and leading domestic brands)

Service process 06
Service process 03
R&D Prototyping & Verification

R&D Execution
✓ Sample production: Fast prototyping by R&D technicians (5-10 working days delivery)
✓ Triple verification testing:

     Functional testing (full load temperature rise/THD analysis)
     Reliability testing (-40℃~85℃ temperature cycling/500-1000h aging)
     Safety pre-certification (2500VAC withstand voltage/leakage current <0.25mA)

Development Process
Requirements input → Solution review → Simulation verification → PCB engineering verification → Prototype testing → Design freeze

Small Batch Trial Production (NPI Stage)

Process Validation
✓ DFM (Design for Manufacturing) report output
✓ First article confirmation:
Functional test: 100% compliance with customer SPEC
Parameter deviation: Critical parameters (efficiency/THD) ≤1%; Non-critical parameters (dimensions / appearance) ≤3%
Additional requirement: Provide customer-approved sample comparison report .

Service product 04
Service process 05
Mass Production (MP Stage)

Production Assurance
✓ Establish dedicated material master data (including alternate part coding cross-reference)
✓ Establish supply chain contingency plan with 3+ backup solutions for key components (MCU/IGBT/MOSFET etc.) covering imported and leading domestic brands
✓ Key component inventory plan (MCU/IGBT/MOSFET safety stock ≥3 months)

Full-process Quality Control System

StageCore Control PointsInspection StandardsData Output
IQCKey component X-ray inspectionBatch consistency CPK≥1.33Component traceability report
SMT3D SPI+AOI full inspectionSolder paste thickness 0.08±0.03mmReal-time yield dashboard (IoT)
DIPOnline ICT testTest coverage ≥100%Pinpoint test report
FCTDynamic load temperature rise testΔT≤40K@rated loadTHD waveform chart
OQCFull parameter final inspectionAQL 1.0 sampling standardQR code traceability archive
Delivery & Continuous Service

Mass Delivery Assurance
✓ Production capacity: Fully automated SMT/DIP lines (daily capacity 30K+)
✓ Quality records: IPC-A-610G inspection records provided per batch
✓ Shipping documents: Include CE/UL certificate numbers, safety test raw data, MTBF prediction report

Product Life-cycle Service
✓ Continuous improvement plan: PDCA report every 100k units (including field failure analysis)
✓ After-sales response: 8D report within 48 hours (containment measures included)
✓ Technical iteration: Seamless hardware platform migration (e.g., STM32F4→SPINTROL)

Service process 02

Global Leader in Intelligent Control Solutions

We uphold the belief that technology creates value, driven by innovation, and are dedicated to delivering exceptional experiences and greater added value to our customers.
Get A Quotation
Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as “Necessary” are stored on your browser as they are essential for enabling the basic functionalities of the site.

We also use third-party cookies that help us analyze how you use this website, store your preferences, and provide the content and advertisements that are relevant to you. These cookies will only be stored in your browser with your prior consent.

You can choose to enable or disable some or all of these cookies but disabling some of them may affect your browsing experience.

Read More
Read Less
Reject AllSave My PreferencesAccept All

Get Instant Quote And Tailored Solution

Please fill out the form below with your details and inquiry. One of our representatives will get back to you within 24h.